Refurbishing for the Future: A D&I Blueprint for Hertfordshire Fire and Rescue Service Stations
When we first began looking seriously at diversity and inclusion (D&I) within the retrofit design of our fire stations in 2023, it could easily have become a policy exercise: a set of principles, a few standard design statements, and buildings that continued looking much as they always had.
That was never going to be enough.
At Hertfordshire Fire and Rescue Service, this work has been practical, challenging and collaborative from the outset. It has meant walking stations with firefighters, listening to what works and what does not, and acknowledging that some long-standing layouts no longer support the workforce we have today, or the one we want to attract in future.
This thinking also started before the Supreme Court ruling and more recent national debate around single-sex spaces. For us, the starting point was practical: how do we provide privacy, dignity and flexibility for the workforce we have now, while making sure the buildings can adapt in future?
Since 2023, we have delivered five stations shaped by this approach, with a further five planned over the next two years. We have not got everything right, and I do not think any retrofit programme ever does. But we have developed a much clearer blueprint for Hertfordshire fire stations: buildings that are operationally effective, safer, more inclusive, and better suited to the realities of modern station life.
The challenge was made greater because the stations remained operational throughout the works. Refurbishment activity had to be carefully phased around working crews, response requirements and the day-to-day demands of running a fire station.
One of the biggest lessons we learned is that D&I cannot sit separately from operational design. In a fire station, every space has to work hard. It needs to support emergency response, training, welfare, rest, contamination control, health and safety, maintenance and day-to-day station life. If a design does not work operationally, it will not succeed, regardless of how good it looks on paper.

Involving firefighters from the start
The most important part of the work has been consultation.
Project teams included firefighters from the start rather than inviting comments once the major decisions had already been made
This was critical because firefighters know their stations better than anyone. They know where kit builds up, where circulation routes become cluttered, where storage falls short, where privacy is lacking. They know where an idea that looks sensible on a drawing board will simply not work at two o’clock in the morning after a difficult incident.
That kind of feedback is invaluable, but it is not always straightforward.
Consultation does not mean everyone agrees. Different watches often have different cultures, preferences and priorities, sometimes completely opposing ones. That is the reality of collaborating with operational teams, and it is not a reason to avoid consultation. It is the reason to do it properly.
Alongside operational crews, we sought expertise from across the service, including fire protection, health and safety, facilities and estates teams, female firefighter groups, accessibility groups and contaminants groups. Each challenged and shaped the design in a different way.
Female firefighters highlighted areas where traditional layouts had fallen short, particularly around changing, showering, privacy and personal space. Accessibility groups challenged us on routes, thresholds, circulation, signage and how the building would work for colleagues and visitors with different needs. Contaminants groups kept the focus on zoning, PPE movement and reducing the risk of contaminants being carried into clean areas.
Those conversations changed the refurbishments in practical ways. More importantly, they helped move D&I away from being viewed as a standalone topic and into the mainstream design conversation where it belongs.
Creating proper rest and personal space
One of the most significant changes has been sleeping accommodation.
Many older stations were designed around shared dormitory spaces, reflecting a different workforce and a different expectation of station life, different to where the service is now.
Privacy came up repeatedly in feedback from crews. Firefighters also raised concerns around personal storage and the need for personal space, that felt like their, own during a shift.

In response, we developed individual air-conditioned dorms, each with four watch lockers. Creating separation for rest and readiness so that Firefighters can recover properly between calls.
Air conditioning has also become more important than we initially appreciated. As summers continue to become warmer, crews are increasingly dealing with wildfires and prolonged heat-related incidents. Returning from those incidents to an environment that is too warm for quality rest affects recovery, wellbeing and readiness for the next call.

Engagement with Hertfordshire’s Menopause Champions further reinforced the importance of providing cooler environments within the workplace. Access to comfortable, temperature-controlled spaces can make a significant difference to wellbeing and ensure stations better support individual needs across the workforce.
That is exactly why consultation matters.


Changing facilities for a modern workforce
Showering and changing provision has been another major area of improvement.
Input from female firefighter groups and wider workforce representatives played an important role in shaping this element of the programme. The result was the introduction of individual shower and changing rooms that provide privacy, dignity and flexibility for all users.

This approach is also about future-proofing. Decisions made during refurbishment projects can influence working conditions for decades. Providing individual facilities gives us greater flexibility because spaces can adapt to changing workforce requirements without expensive structural alterations. In many cases, future changes can be achieved simply by updating signage rather than modifying the building itself.



Facilities should support people to do their job comfortably and professionally, without having to work around poor design.
Ultimately, this is about ensuring every firefighter can shower, change, rest and prepare for duty with the same level of privacy and dignity as their colleagues. That should be a basic expectation in any modern workplace, and a fire station should be no exception.
Learning without being defensive
One of the most useful lessons has been recognising that adaptation is not failure.
Across the five stations, some ideas worked well straight away. Others needed refining. We had to revisit details, challenge assumptions and make changes where feedback showed there was a better way.
That is not always easy. Budgets are tight, programmes are pressured and retrofits are rarely straightforward. There can be a temptation to defend the original design because so much effort has gone into getting it approved but we have learned to be less defensive and more questioning when things do not work.

Buildings do not succeed because the drawings were tidy. They succeed because they work for the people who use them every day.
Maintaining operational stations throughout the works created further complexity. Phasing had to be carefully managed, temporary arrangements needed to remain safe and communication with crews was essential. Firefighters were living and working through the disruption while continuing to provide an emergency service to the public.
Luckily, most crew members still talk to me despite working and living through the refurbs!

The blueprint going forward
The five stations delivered so far have given us confidence, but they have also kept us grounded.
They have demonstrated that inclusive design is achievable within operational fire stations and that dignity, privacy and operational effectiveness can successfully coexist when considered early enough in the design process.
They have also shown that seemingly small details matter enormously: the size of a locker, the route to a shower, whether a dorm is cool enough to sleep in, and whether someone feels comfortable using a changing room.
As Station Commander Steve Smith reflects:
“Having worked within Hertfordshire Fire and Rescue Service for over 21 years, it has been rewarding to see these refurbishment projects delivered through a genuinely collaborative effort involving operational crews, estates, health and safety colleagues, project teams and other stakeholders from across the Service. The way everyone worked together, with a shared focus on improving firefighter wellbeing and safety, was instrumental in the success of the project.”
For me, the key point is simple: D&I is no longer a separate conversation within the estates programme. It is part of the design brief, the consultation, the specification, and the way we judge whether a refurbishment has worked.
Inclusive design is not about adding unnecessary complexity. Done properly, it makes stations operate more effectively, improves privacy, supports welfare and gives crews facilities that reflect how they actually live and work.
The blueprint for future Hertfordshire stations, new or refurbished, is now based on practical experience rather than assumptions. We will keep refining it as the next phase is delivered, but the direction is clear. Our buildings must work operationally, support the people using them and reflect the workforce we have now and the one we want for the future.
Written by Deb Johnson
Senior Facilities Manager at Hertfordshire Fire and Rescue Service

Deborah Johnson is a Senior Facilities Manager supporting Hertfordshire Fire and Rescue Service and County Council. She leads facilities management and estate improvement programmes across the property portfolio, ensuring safe, efficient, and sustainable workplaces that support operational delivery and frontline services.